5 Summary
(1)Classification of the services to be pro-
cured:42
(2)Subject matter of the contract: Prelimi-
nary design work for the construction of J4
Building and other facilities on Suzu-
kakedai Campus, Institute of Science
Tokvo
(3) Time-limit to express interests by elec-
tronic bidding system:5:00P.M.15, July,
2025
(4) Time-limit for the submission of propos-
als by electronic bidding system: 12:00
P.M. 2025
(5) documentatint for documentation relating
to the proposal: Construction Contract
Group, Facilities Planning Division, Facil-
ities Department, National University Cor-
poration Institute of Science Tokyo, 2-
12―1 Ookayama, Meguro-ku, Tokyo, 152―
8550, 03—5734—34—34—34—3405
招請
資料提供招請に関する公表
次のとおり物品の導入を予定していますので、
当該導入に関して資料等の提供を招請します。
令和7年7月1日
国立大学法人北海道国立大学機構
理事長長谷山彰
◎調達機関番号415◎所在地番号01
○第3号
1調達内容
(1)品目分類番号15、28
(2)購入計画物品及び数量北見工業大学ネッ
トワークシステム一式
(3)調達方法借入
(4)導入予定時期令和8年11月以降
(5)調達に必要とされる基本的な要求要件
A本学ネットワークのセンターコアと各学
科等に設置されている基幹スイッチによる
ネットワーク全てを構築すること。
B3,000人のユーザ数による利用に対応す
ること。
C 学内
拠点間は10Gbps以上で通信可能な容量を
備えること。
D冗長化が施され可用性が確保されている
とこ
E認証機構を備え利用者、利用形態につい
てネットワーク的に分離可能な機能を備え
ること。
F学内サーバの認証機構を統一化するため
のセキュアな通信機構を備えること。
G学外との通信における十分なセキュリ
ティが確保され、相応のウィルスチェック
処理能力を備えること。
H学内200カ所以上にアクセスポイントを
設置し、無線LAN環境を構築すること。
ネットワーク運用に必要なDNSおよび
DHCP等のサービスを提供すること。
Jスイッチおよびサーバの監視機能を実装
すること。
K運用管理の一元化に対応すること。
Lシステム全体で省電力化ならびに省ス
ペース、低騒音化を実現すること。
M障害ならびに運用変更に迅速に対応する
十分な保守・サービス体制をとること。
2資料及びコメントの提供方法上記1(2)の物
品に関する一般的な参考資料及び同(5)の要求要
件等に関するコメント並びに提供可能なライプ
ラリーに関する資料等の提供を招請する。
(1)資料等の提供期限令和7年8月8日17時
00分(郵送の場合は必着のこと。)
(2)提供先090-8507北海道北見市公園町
165北見工業大学管理課調達係長佐々木
有香電話0157-26-9128
3説明書の交付本公表に基づき応募する供給
者に対して導入説明書を交付する。
(1)交付期間令和7年7月1日から令和7年
8月8日まで。
(2)交付場所上記2(2)に同じ。
4その他この導入計画の詳細は導入説明書に
よる。なお、本公表内容は予定であり、変更す
ることがあり得る。
5 Summary
(1)Classification of the products to be pro-
cured : 15,28
(2)Nature and quantity of the products to be
rent : KITAMI Institute of Technology net-
work system 1 Set
(3) Type of the procurement : Rent
(4) Basic requirements of the procurement:
A The entire network system shall be co-
nstructed, including the central core of
the university network and the core
switches deployed in each academic de-
partment and related facilities
B The system shall support concurrent
use by up to 3,000 users.
C The system shall provide a total exter-
nal communication bandwidth of 200
Gbps (100 Gbps×2), and a minimum of
10 Gbps bandwidth between on-campus
sites.
D The system shall be designed with re-
dundancy to ensure high availability.
E The system shall incorporate an aut-
hentication mechanism and support logi-
cal network segmentation based on user
roles and usage types.
F A secure communication mechanism
shall be implemented to enable unified
authentication across all on-campus serv-
ers.
G Adequate security measures shall be in
place for external communications, in-
cluding sufficient virus scanning capabil-
ities
H Wireless LAN access points shall be
deployed at more than 200 locations th-
roughout the campus to provide compre-
hensive wireless coverage.
I Core network services necessary for
operation, such as DNS and DHCP, shall
be provided
J Monitoring capabilities for switches
and servers shall be implemented.
K The system shall support centralized
operational management.
L The entire system shall be designed
with power efficiency, space-saving, and
low-noise considerations.
M A robust maintenance and support fra-
mework shall be established to enable
prompt response to system failures and
operational changes
(5) Time limit for the submission of the re-
quested material : 17:00,8 August, 2025
(6)Contact point for the notice: Sasaki
Yuka, Contract Section, Finance and Facil
ities Section, Kitami Institute of Technol
ogy,165Koen-cho Kitami-shi, Hokkaido
090—8507 Japan,TEL0157-26-9128